DocumentCode
3329509
Title
Study on the Key Equipment´s Insulation Level of ±800kV UHVDC Power Transmission Project
Author
Jinzhuang, Lv ; Licheng, Li
Author_Institution
China Southern Power Grid Co., Ltd., Guangzhou
fYear
2007
fDate
16-20 July 2007
Firstpage
1
Lastpage
4
Abstract
China is currently pushing on constructing plusmn800 kV UHVDC power transmission projects. The Yunnan-Guangdong power transmission project to be built in 2009 will be the first UHVDC power transmission project around the world. The paper has presented insulation level and insulation coordination for the key equipment, which would be adopted in the Yunnan-Guangdong UHVDC Project. The research result herein reveals that, compared to 1.6 times insulation level of the key equipments of traditional plusmn500 kV project, it is practical to reduce that of UHVDC project respectively, and the technical measurement would be rational arrangement of arrester and smoothing reactor and reasonable reduction of insulation margin. Furthermore, the test voltage level corresponding to long DC operation voltage has also been discussed in this paper, which is for evaluating internal insulation withstanding capability.
Keywords
insulation; power transmission; UHVDC; equipment´s insulation level; power transmission project; ultra high voltage direct current; Hydroelectric power generation; Insulation; Job shop scheduling; Power generation; Power grids; Power transmission; Power transmission lines; Space technology; Valves; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society Conference and Exposition in Africa, 2007. PowerAfrica '07. IEEE
Conference_Location
Johannesburg
Print_ISBN
978-1-4244-1477-2
Electronic_ISBN
978-1-4244-1478-9
Type
conf
DOI
10.1109/PESAFR.2007.4498055
Filename
4498055