Title :
On Distribution Asset Management: Development of Replacement Strategies
Author :
Begovic, Miroslav ; Perkel, Joshua ; Hampton, Nigel ; Hartlein, Rick
Author_Institution :
Sch. of ECE, Georgia Inst. of Technol., Atlanta, GA
Abstract :
The components of electricity networks are ageing. It is expected that within a horizon of 15 years, the performance will deteriorate significantly, while the costs for operating the networks will increase enormously. The main problem is that a significant part of the population of the assets is installed in the same period, resulting in a highly concentrated number of failures in a short time. The currently applied replacement strategy has to be revisited, in order to accommodate the effects of ageing assets: higher maintenance costs, high failure rates, and a steep increase of capital expenditure (CAPEX).
Keywords :
distribution networks; power system management; capital expenditure; distribution asset management; electricity networks; replacement strategies; Africa; Aging; Asset management; Condition monitoring; Costs; Power cables; Predictive models; Statistics; USA Councils; Uncertainty;
Conference_Titel :
Power Engineering Society Conference and Exposition in Africa, 2007. PowerAfrica '07. IEEE
Conference_Location :
Johannesburg
Print_ISBN :
978-1-4244-1477-2
Electronic_ISBN :
978-1-4244-1478-9
DOI :
10.1109/PESAFR.2007.4498062