• DocumentCode
    3330209
  • Title

    Feasibility of Increased Power via Apollo Songo HVDC Scheme

  • Author

    Mbuli, N.

  • Author_Institution
    Eskom Res. & Innovation Dept., Cleveland
  • fYear
    2007
  • fDate
    16-20 July 2007
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The Apollo Songo HVDC scheme receives power generated at Cahora Bassa hydro power station. At Songo converter station, this power is converted to dc and sent to Apollo converter station. At present, the scheme is rated to send about 1920 MW from Songo. There is a potential for new generation capacity in Mozambique due to availability of gas and hydro fuels. A possibility of transporting some of this power to South Africa exists. The key question that follows is how far can the existing Apollo Songo HVDC infrastructure be used to transport some of the expected power. In this paper feasibility results will be presented for the studies done on a number of possible scenarios for transporting of the power via the scheme from Songo to Apollo.
  • Keywords
    HVDC power convertors; HVDC power transmission; hydroelectric power stations; Apollo Songo HVDC scheme; Cahora Bassa hydro power station; Mozambique; South Africa; converter station; generation capacity; hydro fuels; power 1920 MW; power generation; Africa; Analog-digital conversion; Bridge circuits; Fuels; HVDC transmission; Joining processes; Power generation; Steady-state; Technological innovation; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society Conference and Exposition in Africa, 2007. PowerAfrica '07. IEEE
  • Conference_Location
    Johannesburg
  • Print_ISBN
    978-1-4244-1477-2
  • Electronic_ISBN
    978-1-4244-1478-9
  • Type

    conf

  • DOI
    10.1109/PESAFR.2007.4498094
  • Filename
    4498094