DocumentCode :
3332342
Title :
Advanced hybrid scheduling system for manufacturing
Author :
Tsukiyama, Makoto ; Mori, Kazuyuki
Author_Institution :
Mitsubishi Electric Corp., Amagasaki, Japan
fYear :
1991
fDate :
28 Oct-1 Nov 1991
Firstpage :
75
Abstract :
The authors describe an advanced scheduling method based on a constraint-based scheduling editor and a Petri-net simulator. The advantage of this method is that the human scheduler can debug the schedule through a comprehensive Gantt chart and process chart. Backward scheduling, which is one function of the constraint-based scheduling editor, is found to be a powerful tool for due date scheduling. Computational experience indicates that the proposed approach is promising for generating and modifying a schedule, and for dynamic scheduling to respond to factory state changes
Keywords :
Petri nets; manufacturing data processing; production control; Gantt chart; Petri-net simulator; backward scheduling; constraint-based scheduling editor; hybrid scheduling system; manufacturing; process chart; Computational modeling; Computer aided manufacturing; Discrete event simulation; Dynamic scheduling; Humans; Job shop scheduling; Manufacturing systems; Processor scheduling; Production facilities; Virtual manufacturing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Electronics, Control and Instrumentation, 1991. Proceedings. IECON '91., 1991 International Conference on
Conference_Location :
Kobe
Print_ISBN :
0-87942-688-8
Type :
conf
DOI :
10.1109/IECON.1991.239325
Filename :
239325
Link To Document :
بازگشت