DocumentCode
334145
Title
Status and early commissioning of the PEP-II High Energy Ring
Author
Wienands, U. ; Reuter, E. ; Bellomo, P. ; Fisher, A. ; Gracia, J. ; Gray, R. ; Pietryka, M. ; Taylor, T. ; Bharadwaj, V. ; Iverson, R. ; Kulikov, A. ; Seeman, J.T. ; Turner, J. ; Belser, C. ; Zisman, M. ; Zholents, S.
Author_Institution
Linear Accel. Center, Stanford Univ., CA, USA
Volume
1
fYear
1997
fDate
12-16 May 1997
Firstpage
315
Abstract
The High Energy Ring of the PEP-II B-Factory has been constructed in the PEP tunnel. It is now beginning beam commissioning. This report will address the status of the ring systems and our experience in commissioning the systems as well as the first beam running
Keywords
beam handling techniques; colliding beam accelerators; electron accelerators; storage rings; PEP-II B-Factory; PEP-II High Energy Ring; early commissioning; first beam running; Control systems; Electron beams; History; Laser excitation; Magnets; Pollution measurement; Power supplies; Region 2; Structural beams; Vacuum systems;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-4376-X
Type
conf
DOI
10.1109/PAC.1997.749627
Filename
749627
Link To Document