DocumentCode
334282
Title
Recent results of the commissioning of the DELTA facility
Author
Friedl, J.
Author_Institution
Inst. for Accel. Phys. & Synchrotron Radiat., Dortmund Univ., Germany
Volume
1
fYear
1997
fDate
12-16 May 1997
Firstpage
724
Abstract
The DELTA storage ring facility, consisting of a 100 MeV linac, the booster storage ring BoDo and the 1.5 GeV main storage ring, is under commissioning since fall ´94. All accelerators are in operation. DELTA includes all features of a 3rd generation light source, but in contrast to a user source this facility is mainly devoted to the test and development of components for future accelerators. The second main goal of the facility is to drive short wavelength free-electron-lasers. Furthermore, special beam conditions for single user experiments and local synchrotron radiation users will be provided. This paper presents the recent results of the commissioning of the facility and first measurements of spontaneous synchrotron radiation emitted from the FEL-undulator FELICITA I
Keywords
X-ray production; commissioning; electron accelerators; storage rings; 1.5 GeV; 100 MeV; 3rd generation light source; BoDo; DELTA storage ring; FELICITA I; booster storage ring; commissioning; linac; synchrotron radiation; Acceleration; Klystrons; Life estimation; Light sources; Linear particle accelerator; Radio frequency; Storage rings; Structural beams; Synchrotron radiation; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-4376-X
Type
conf
DOI
10.1109/PAC.1997.749816
Filename
749816
Link To Document