    Recent results of the commissioning of the DELTA facility

  • Author

    Friedl, J.

  • Author_Institution
    Inst. for Accel. Phys. & Synchrotron Radiat., Dortmund Univ., Germany
  • Volume
    1
  • fYear
    1997
  • fDate
    12-16 May 1997
  • Firstpage
    724
  • Abstract
    The DELTA storage ring facility, consisting of a 100 MeV linac, the booster storage ring BoDo and the 1.5 GeV main storage ring, is under commissioning since fall ´94. All accelerators are in operation. DELTA includes all features of a 3rd generation light source, but in contrast to a user source this facility is mainly devoted to the test and development of components for future accelerators. The second main goal of the facility is to drive short wavelength free-electron-lasers. Furthermore, special beam conditions for single user experiments and local synchrotron radiation users will be provided. This paper presents the recent results of the commissioning of the facility and first measurements of spontaneous synchrotron radiation emitted from the FEL-undulator FELICITA I
  • Keywords
    X-ray production; commissioning; electron accelerators; storage rings; 1.5 GeV; 100 MeV; 3rd generation light source; BoDo; DELTA storage ring; FELICITA I; booster storage ring; commissioning; linac; synchrotron radiation; Acceleration; Klystrons; Life estimation; Light sources; Linear particle accelerator; Radio frequency; Storage rings; Structural beams; Synchrotron radiation; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1997. Proceedings of the 1997
  • Conference_Location
    Vancouver, BC
  • Print_ISBN
    0-7803-4376-X
  • Type

    conf

  • DOI
    10.1109/PAC.1997.749816
  • Filename
    749816