DocumentCode
334311
Title
Commissioning and operation of the Brazilian Synchrotron Light Source
Author
Rodrigues, A.R.D. ; Farias, R.H.A. ; Ferreira, M.J. ; Franco, G.S. ; Jahnel, L.C. ; Lin, Liu ; Lira, A.C. ; Neuenschwander, R.T. ; Pardine, C. ; Rafael, F. ; Rosa, A. ; Scorzato, C. ; Silva, C. E T Goçalves da ; Silva, A. Romeu da ; Tavares, P.F. ; Wisniv
Author_Institution
Lab. Nacional de Luz Sincrotron, Campinas, Brazil
Volume
1
fYear
1997
fDate
12-16 May 1997
Firstpage
811
Abstract
The Brazilian National Synchrotron Light Laboratory, LNLS, operates a 1.37 GeV electron storage ring with a 120 MeV injector linac. Commissioning of the storage ring at low energy started on May 1996 and now, an year later, we can store 120 mA at 120 MeV and ramp more than 75 mA to 1.37 GeV. A summary of the latest commissioning results and a description of the present operational performance of the LNLS Synchrotron Light Source facility is presented
Keywords
booster injectors; electron accelerators; storage rings; 1.37 GeV; Brazilian National Synchrotron Light Laboratory; Brazilian Synchrotron Light Source; commissioning; electron storage ring; injector linac; operation; Brazil Council; Damping; Electrons; Laboratories; Light sources; Linear particle accelerator; Pulse shaping methods; Radio frequency; Storage rings; Synchrotrons;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location
Vancouver, BC
Print_ISBN
0-7803-4376-X
Type
conf
DOI
10.1109/PAC.1997.749845
Filename
749845
Link To Document