DocumentCode
3343894
Title
Cyclic flow shop scheduling based on timed event graph extended with disjunctive constraints
Author
Ren, Si-Cheng ; Xu, De ; Wang, Fang ; Tan, Min
Author_Institution
Inst. of Autom., Chinese Acad. of Sci., Beijing, China
fYear
2005
fDate
14-17 Dec. 2005
Firstpage
926
Lastpage
931
Abstract
The cyclic flow shop is one flow shop that repetitively produces the product mix. We propose that the cyclic flow shops can be modeled as time event graphs extended with disjunctive constraints. Based on the timed event graph models, mixed-integer programs are established to find the optimal schedule under with the system functions with the minimal cycle time. Three different cases of cyclic flow shops are discussed respectively.
Keywords
graph theory; integer programming; job shop scheduling; cyclic flow shop scheduling; disjunctive constraints; mixed-integer programs; system functions; time event graph models; Automation; Costs; Hydrogen; Job shop scheduling; Manufacturing systems; Optimal scheduling; Petri nets; Production; Throughput; Transportation;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Technology, 2005. ICIT 2005. IEEE International Conference on
Print_ISBN
0-7803-9484-4
Type
conf
DOI
10.1109/ICIT.2005.1600768
Filename
1600768
Link To Document