DocumentCode :
334454
Title :
Kicker system for 8 GeV proton injection
Author :
Qunell, D. ; Jensen, C. ; Tinsley, D.
Author_Institution :
Fermi Nat. Accel. Lab., Batavia, IL, USA
Volume :
1
fYear :
1997
fDate :
12-16 May 1997
Firstpage :
1287
Abstract :
This kicker functions to inject 6 batches of 8 GeV beam vertically into the Fermilab Main Injector from the Booster. The trajectory of this beam must be bent 1.05 mr to place it onto equilibrium orbit. This kicker system produces a nominal integrated field kick of 0.309 kG-m. Specifications require a 1.6 microsecond pulse with a 50 ns risetime (1%-99%) and a 150 ns falltime (99%-5%). The system is comprised of three magnets and power supplies. Each is composed of a resonant charger, a 25 Ω PFL, a thyratron-based pulsed power supply, a ferrite “C” magnet, and a FluorinertTM-cooled resistive load. Design details and measurements are presented
Keywords :
accelerator RF systems; accelerator magnets; electromagnets; particle beam injection; proton accelerators; pulsed power supplies; thyratrons; 25 ohm; 8 GeV; Fermilab Main Injector; Fluorinert-cooled resistive load; equilibrium orbit; ferrite C magnet; kicker functions; proton injection; resonant charger; thyratron-based pulsed power supply; Capacitance measurement; Impedance measurement; Magnetic field measurement; Magnets; Power supplies; Protons; Pulse measurements; Pulsed power supplies; Resonance; Thyratrons;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1997. Proceedings of the 1997
Conference_Location :
Vancouver, BC
Print_ISBN :
0-7803-4376-X
Type :
conf
DOI :
10.1109/PAC.1997.750002
Filename :
750002
Link To Document :
بازگشت