DocumentCode
3349430
Title
Notice of Retraction
Application of AHP-GCP model in weapon equipment research project evaluation
Author
Li Kan ; Ma Yunlai
Author_Institution
Dept. of Scentific Res., Dalian Naval Acad., Dalian, China
Volume
4
fYear
2011
fDate
26-28 July 2011
Firstpage
1977
Lastpage
1980
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
In view of the disadvantage of the methods on weapon equipment research project between local and abroad, the author constructs a AHP-GCP model by the valid connection of AHP(Analytic Hierarchy Process) and GCP(Catastrophe Progression Process), and applies it in evaluation model of weapon equipment research project, and the result indicates that this method can evaluate the weapon equipment research project effectively, and can remedy the defect of the weapon equipment research project evaluation to some extent. Thus provides an effective approach for weapon equipment research project evaluation.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
In view of the disadvantage of the methods on weapon equipment research project between local and abroad, the author constructs a AHP-GCP model by the valid connection of AHP(Analytic Hierarchy Process) and GCP(Catastrophe Progression Process), and applies it in evaluation model of weapon equipment research project, and the result indicates that this method can evaluate the weapon equipment research project effectively, and can remedy the defect of the weapon equipment research project evaluation to some extent. Thus provides an effective approach for weapon equipment research project evaluation.
Keywords
decision making; military equipment; weapons; AHP; GCP model; analytic hierarchy process; catastrophe progression process; research project evaluation model; weapon equipment; Buildings; Computational modeling; Indexes; Mathematical model; Weapons; Weight measurement; Analytic Hierarchy Process; Gray Clustering Process; weapon equipment research project evaluation;
fLanguage
English
Publisher
ieee
Conference_Titel
Natural Computation (ICNC), 2011 Seventh International Conference on
Conference_Location
Shanghai
ISSN
2157-9555
Print_ISBN
978-1-4244-9950-2
Type
conf
DOI
10.1109/ICNC.2011.6022537
Filename
6022537
Link To Document