DocumentCode :
3349604
Title :
Material substitution selection algorithm for complex equipment assembling production
Author :
Xue, Dongjuan ; Huang, Xuewen
Author_Institution :
Sch. of Mech. Eng., Dalian Fisheries Univ., Dalian, China
fYear :
2010
fDate :
26-28 June 2010
Firstpage :
3305
Lastpage :
3308
Abstract :
Aiming at material kitting and substitution reduced by production changes during complex equipment production process and by analysis of material requirements harmony among product BOM, process planning BOM and production planning BOM, the model of material substitution has been established with materials kitting constraint. By using cost-minimizing as optimized purpose and according to material different attributes(design attributes, process attributes and planning attributes) as contain parameters of materials institution, an algorithm rule is designed to select part substitution to make materials selection, match and institution come true and ensure required materials arrived sufficiently and timely. Finally, the solution is proven to be reasonable and effective in an application example.
Keywords :
assembling; minimisation; process planning; product design; production equipment; production planning; complex equipment assembling production; cost-minimizing technique; material substitution selection algorithm; materials kitting constraint; process planning BOM; product BOM; production planning BOM; Aerospace materials; Aircraft; Assembly systems; Bills of materials; Costs; Job shop scheduling; Manufacturing processes; Mechanical engineering; Process planning; Production planning; Assembling; Equipmen; Materials Kitting; Substitution;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Mechanic Automation and Control Engineering (MACE), 2010 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-7737-1
Type :
conf
DOI :
10.1109/MACE.2010.5535623
Filename :
5535623
Link To Document :
بازگشت