• DocumentCode
    3349964
  • Title

    A coal mine production scheduling optimization system and its application

  • Author

    Sun Zhenming ; Zhao Yiqing ; Li Zhongxue ; Cao Zhiguo

  • Author_Institution
    Dept. of Miner. Resources Eng., Univ. of Sci. & Technol. Beijing, Beijing, China
  • Volume
    4
  • fYear
    2011
  • fDate
    26-28 July 2011
  • Firstpage
    1889
  • Lastpage
    1892
  • Abstract
    To raise the utilization rate of coal and gain more profit, a production scheduling optimization system was developed with Visual Basic .NET and MATLAB. The system can not only promote coal mine production but also enable coal mine to response to market demands and customer requirements quickly. Furthermore, the coal company can adjust production plan to realize maximum profits based on the optimized schedule provide by the system. Lastly, the system was applied successfully in a surface coal mine of China.
  • Keywords
    Visual BASIC; mathematics computing; mining; production engineering computing; scheduling; MATLAB; coal company; coal mine production scheduling optimization system; customer requirements; market demands; surface coal mine; visual BASIC NET; Coal; Databases; MATLAB; Mathematical model; Optimization; Production planning; MATLAB; Visual Basic .NET; coal mine; production scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Natural Computation (ICNC), 2011 Seventh International Conference on
  • Conference_Location
    Shanghai
  • ISSN
    2157-9555
  • Print_ISBN
    978-1-4244-9950-2
  • Type

    conf

  • DOI
    10.1109/ICNC.2011.6022568
  • Filename
    6022568