DocumentCode
3349964
Title
A coal mine production scheduling optimization system and its application
Author
Sun Zhenming ; Zhao Yiqing ; Li Zhongxue ; Cao Zhiguo
Author_Institution
Dept. of Miner. Resources Eng., Univ. of Sci. & Technol. Beijing, Beijing, China
Volume
4
fYear
2011
fDate
26-28 July 2011
Firstpage
1889
Lastpage
1892
Abstract
To raise the utilization rate of coal and gain more profit, a production scheduling optimization system was developed with Visual Basic .NET and MATLAB. The system can not only promote coal mine production but also enable coal mine to response to market demands and customer requirements quickly. Furthermore, the coal company can adjust production plan to realize maximum profits based on the optimized schedule provide by the system. Lastly, the system was applied successfully in a surface coal mine of China.
Keywords
Visual BASIC; mathematics computing; mining; production engineering computing; scheduling; MATLAB; coal company; coal mine production scheduling optimization system; customer requirements; market demands; surface coal mine; visual BASIC NET; Coal; Databases; MATLAB; Mathematical model; Optimization; Production planning; MATLAB; Visual Basic .NET; coal mine; production scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Natural Computation (ICNC), 2011 Seventh International Conference on
Conference_Location
Shanghai
ISSN
2157-9555
Print_ISBN
978-1-4244-9950-2
Type
conf
DOI
10.1109/ICNC.2011.6022568
Filename
6022568
Link To Document