• DocumentCode
    335013
  • Title

    Status of the PEP-II transverse feedback systems

  • Author

    Barry, W. ; Corlett, J. ; Fahmie, M. ; Greer, J. ; Lambertson, G. ; Pike, C.

  • Author_Institution
    Lawrence Berkeley Nat. Lab., CA, USA
  • Volume
    2
  • fYear
    1997
  • fDate
    12-16 May 1997
  • Firstpage
    2344
  • Abstract
    The feedback systems for controlling transverse coupled-bunch instabilities in both the high and low energy rings of the PEP-II collider are complete and installed on site. Presently, the high energy ring of the collider is beginning commissioning. The commissioning of the high energy ring transverse feedback system is expected to begin sometime in the next few weeks. Design specifications and the basic system concept are reviewed. Selected bench-test results for various system components are discussed including results from the sum-signal orbit offset cancellation electronics
  • Keywords
    accelerator control systems; electron accelerators; feedback; storage rings; PEP-II; commissioning; sum-signal orbit offset cancellation electronics; transverse coupled-bunch instabilities; transverse feedback systems; Baseband; Circuits; Damping; Dynamic range; Feedback loop; Filling; Impedance; Radio frequency; Storage rings; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1997. Proceedings of the 1997
  • Conference_Location
    Vancouver, BC
  • Print_ISBN
    0-7803-4376-X
  • Type

    conf

  • DOI
    10.1109/PAC.1997.751203
  • Filename
    751203