Title :
Comparison with Three Projects of Auxiliary Power Wiring for 1000MW Unit Based on ETAP
Author :
Sun Shuqin ; Zhou Lei ; Wang Jian ; Meng Lingshuai ; Han Liang ; Li Weibo
Author_Institution :
Coll. of Instrum. Sci. & Electr. Eng., Jilin Univ., Changchun
Abstract :
With the development of economy and increase of electro-capacity in our country, large capacity 1000MW power units will become the main force of power system. As a result, the auxiliary power system wiring will be complex due to the increasing of capacity and types of auxiliary machines, at the same time, the problems of large short circuit current and difficulty of motor starting are appearing. The ETAP software is used to model three projects of auxiliary power system for 1000MW units, they are project one (lOkV one voltage grade three sections wiring), project two (6kV one voltage grade four sections wiring), project three (6kV one voltage grade three sections wiring). The reliability, power flow and short circuit current of system are calculated and motor starting checkout is carried through. Meanwhile, the economic data and power consumption rate are given in this paper. The data of the three projects are integrated and analyzed to supply references for the future designing.
Keywords :
power system analysis computing; power system reliability; short-circuit currents; wiring; ETAP software; auxiliary machines; auxiliary power system wiring; motor starting checkout; power 1000 MW; power flow; reliability; short circuit current; Energy consumption; Integrated circuit reliability; Load flow; Power generation economics; Power system economics; Power system modeling; Power system reliability; Short circuit currents; Voltage; Wiring;
Conference_Titel :
Power and Energy Engineering Conference, 2009. APPEEC 2009. Asia-Pacific
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-2486-3
Electronic_ISBN :
978-1-4244-2487-0
DOI :
10.1109/APPEEC.2009.4918230