DocumentCode :
3351470
Title :
Resource-Constrained Project Scheduling Based on ACO-Critical Chain Method
Author :
Li, Kewen ; Gong, Lina ; Kou, Jisong
Author_Institution :
Coll. of Comput. & Commun. Eng., China Univ. of Pet., Dongying, China
Volume :
2
fYear :
2009
fDate :
28-30 Oct. 2009
Firstpage :
485
Lastpage :
489
Abstract :
Based on the effective heuristic algorithm and critical chain method proposed by predecessors, the paper presents ACE-Critical chain method for the resource-constrained project scheduling problem. First, ACO searches the solution space and generates activity lists to provide the critical chain for critical chain method; then critical chain method applies the project buffer and project flexible coefficient or activity flexible coefficient to adjust the project completed time, so that the project completed time will be more accurate. At the same time, the paper adopts the change of resource utilization rate to denote the heuristic information, and gives two flexible coefficients to modify the project completed time.
Keywords :
constraint theory; optimisation; project management; resource allocation; scheduling; ACO critical chain method; activity flexible coefficient; ant colony optimisation; project completed time; project flexible coefficient; resource constrained project scheduling; resource utilization rate; Computer science; Constraint optimization; Educational institutions; Engineering management; Heuristic algorithms; Petroleum; Processor scheduling; Project management; Resource management; Scheduling algorithm; ACO; critical chain; project scheduling; resource constrained;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Science and Engineering, 2009. WCSE '09. Second International Workshop on
Conference_Location :
Qingdao
Print_ISBN :
978-0-7695-3881-5
Type :
conf
DOI :
10.1109/WCSE.2009.858
Filename :
5403241
Link To Document :
بازگشت