  • Abstract
    The UHV AC and DC demonstration lines and test bases, several first UHV projects in China, are under construction. The UHV key technologies research achievements can be directly used in the construction of the test lines and test bases, the former research achievements can be validated; the equipment can be applied and tested. Hence, the test lines and bases have the abilities to validate the prophase research achievements in China, the performance and reliability of the equipment, which are very important for the design, operation and maintenance of future UHV projects in China. The design parameters and construction of UHV AC, UHV DC test and demonstration lines, UHV AC, DC test bases of SGCC are introduced in this paper.
  • Keywords
    power transmission lines; reliability; test equipment; China; UHV demonstration and test projects; UHV demonstration lines; UHV test bases; equipment reliability; Conductors; Geographic Information Systems; Poles and towers; Power grids; Power systems; Power transmission lines; Substations; Testing; Voltage; Wire;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Engineering Conference, 2009. APPEEC 2009. Asia-Pacific
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-2486-3
  • Electronic_ISBN
    978-1-4244-2487-0
  • Type

    conf

  • DOI
    10.1109/APPEEC.2009.4918237
  • Filename
    4918237