Abstract
The UHV AC and DC demonstration lines and test bases, several first UHV projects in China, are under construction. The UHV key technologies research achievements can be directly used in the construction of the test lines and test bases, the former research achievements can be validated; the equipment can be applied and tested. Hence, the test lines and bases have the abilities to validate the prophase research achievements in China, the performance and reliability of the equipment, which are very important for the design, operation and maintenance of future UHV projects in China. The design parameters and construction of UHV AC, UHV DC test and demonstration lines, UHV AC, DC test bases of SGCC are introduced in this paper.
Keywords
power transmission lines; reliability; test equipment; China; UHV demonstration and test projects; UHV demonstration lines; UHV test bases; equipment reliability; Conductors; Geographic Information Systems; Poles and towers; Power grids; Power systems; Power transmission lines; Substations; Testing; Voltage; Wire;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Engineering Conference, 2009. APPEEC 2009. Asia-Pacific
Conference_Location
Wuhan
Print_ISBN
978-1-4244-2486-3
Electronic_ISBN
978-1-4244-2487-0
Type
conf
DOI
10.1109/APPEEC.2009.4918237
Filename
4918237
Link To Document