• DocumentCode
    3351635
  • Title

    A economic lot scheduling problem for manufacturing and remanufacturing

  • Author

    Ouyang, Huiqing ; Zhu, XiangYang

  • Author_Institution
    Sch. of Mech. Eng., Shanghai Jiao Tong Univ., Shanghai
  • fYear
    2008
  • fDate
    21-24 Sept. 2008
  • Firstpage
    1171
  • Lastpage
    1175
  • Abstract
    Recently, remanufacturing has received more and more attention by many manufacturers. It is economical to schedule manufacturing and remanufacturing on the same single product line due to setup cost saving. In this paper, we extend the classical economic lot scheduling problem to schedule the manufacturing and remanufacturing on the same single product line. We assume that the demand rate and return rate are constant and the product line has limited capacity of manufacturing and remanufacturing. We employ the Common Cycle approach to coordinate manufacturing with remanufacturing such that the total cost of per unit time is minimized. Furthermore, many numerical examples are presented to show the effects of return rate on the performance of this manufacturing/remanufacturing hybrid system.
  • Keywords
    lot sizing; manufacturing systems; recycling; scheduling; common cycle approach; economic lot scheduling; manufacturing system; remanufacturing system; setup cost saving; single product line; Costs; Environmental economics; Inventory control; Job shop scheduling; Manufacturing processes; Mathematical model; Mechanical engineering; Production planning; Pulp manufacturing; Reverse logistics; Inventory Control; Remanufacturing; Reverse Logistics;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Cybernetics and Intelligent Systems, 2008 IEEE Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4244-1673-8
  • Electronic_ISBN
    978-1-4244-1674-5
  • Type

    conf

  • DOI
    10.1109/ICCIS.2008.4670892
  • Filename
    4670892