Title :
A economic lot scheduling problem for manufacturing and remanufacturing
Author :
Ouyang, Huiqing ; Zhu, XiangYang
Author_Institution :
Sch. of Mech. Eng., Shanghai Jiao Tong Univ., Shanghai
Abstract :
Recently, remanufacturing has received more and more attention by many manufacturers. It is economical to schedule manufacturing and remanufacturing on the same single product line due to setup cost saving. In this paper, we extend the classical economic lot scheduling problem to schedule the manufacturing and remanufacturing on the same single product line. We assume that the demand rate and return rate are constant and the product line has limited capacity of manufacturing and remanufacturing. We employ the Common Cycle approach to coordinate manufacturing with remanufacturing such that the total cost of per unit time is minimized. Furthermore, many numerical examples are presented to show the effects of return rate on the performance of this manufacturing/remanufacturing hybrid system.
Keywords :
lot sizing; manufacturing systems; recycling; scheduling; common cycle approach; economic lot scheduling; manufacturing system; remanufacturing system; setup cost saving; single product line; Costs; Environmental economics; Inventory control; Job shop scheduling; Manufacturing processes; Mathematical model; Mechanical engineering; Production planning; Pulp manufacturing; Reverse logistics; Inventory Control; Remanufacturing; Reverse Logistics;
Conference_Titel :
Cybernetics and Intelligent Systems, 2008 IEEE Conference on
Conference_Location :
Chengdu
Print_ISBN :
978-1-4244-1673-8
Electronic_ISBN :
978-1-4244-1674-5
DOI :
10.1109/ICCIS.2008.4670892