DocumentCode :
3351882
Title :
Analysis of mass concrete construction
Author :
Yancang, Li ; Yingying, Lian
Author_Institution :
Coll. of Civil Eng., Hebei Univ. of Eng., Handan, China
fYear :
2010
fDate :
26-28 June 2010
Firstpage :
4282
Lastpage :
4284
Abstract :
In order to shorten concrete temperature difference between inside and outside, the internal temperature of concrete were considered. The method of laying cooling pipes in concrete was proposed. First of all, a certain thickness of concrete was cast in the pit or groove, and its surface was slotted. After that, the steel and scaffolding were installed on it. Using the method, we can reduce the internal temperature of concrete faster, thereby reducing temperature difference between inside and outside. And the method can control the temperature easily, and shorten the schedule.
Keywords :
concrete; cooling; concrete temperature difference; cooling pipes; groove; mass concrete construction; pit; scaffolding; Civil engineering; Concrete; Cooling; Educational institutions; Finance; Steel; Stress measurement; Temperature control; Weight control; cooling water; mass concrete; temperature difference; temperature stress;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Mechanic Automation and Control Engineering (MACE), 2010 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-7737-1
Type :
conf
DOI :
10.1109/MACE.2010.5535779
Filename :
5535779
Link To Document :
بازگشت