• DocumentCode
    335201
  • Title

    A procedure for dynamic sharing of components in multiple-workcell process plants

  • Author

    Gu, Jianhua ; De Silva, Clarence W.

  • Author_Institution
    Dept. of Mech. Eng., British Columbia Univ., Vancouver, BC, Canada
  • Volume
    1
  • fYear
    1994
  • fDate
    29 June-1 July 1994
  • Firstpage
    289
  • Abstract
    This paper addresses the problem of dynamic handling of component overloads in a process plant that consists of several workcells. An approach is presented to evaluate the component overloads and to systematically reduce these overloads through component sharing both within a workcell and between several workcells. A blackboard architecture is described for implementation of the approach using Prolog. A simulation example of a fish processing plant is presented to illustrate the application of the approach.
  • Keywords
    blackboard architecture; food processing industry; knowledge representation; process control; production engineering computing; blackboard architecture; component overloads; component sharing; dynamic sharing; fish processing plant; multiple-workcell process plants; Automation; Capacity planning; Control systems; Intelligent systems; Knowledge based systems; Laboratories; Marine animals; Mechanical engineering; Production systems; Supply and demand;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    American Control Conference, 1994
  • Print_ISBN
    0-7803-1783-1
  • Type

    conf

  • DOI
    10.1109/ACC.1994.751744
  • Filename
    751744