DocumentCode :
335201
Title :
A procedure for dynamic sharing of components in multiple-workcell process plants
Author :
Gu, Jianhua ; De Silva, Clarence W.
Author_Institution :
Dept. of Mech. Eng., British Columbia Univ., Vancouver, BC, Canada
Volume :
1
fYear :
1994
fDate :
29 June-1 July 1994
Firstpage :
289
Abstract :
This paper addresses the problem of dynamic handling of component overloads in a process plant that consists of several workcells. An approach is presented to evaluate the component overloads and to systematically reduce these overloads through component sharing both within a workcell and between several workcells. A blackboard architecture is described for implementation of the approach using Prolog. A simulation example of a fish processing plant is presented to illustrate the application of the approach.
Keywords :
blackboard architecture; food processing industry; knowledge representation; process control; production engineering computing; blackboard architecture; component overloads; component sharing; dynamic sharing; fish processing plant; multiple-workcell process plants; Automation; Capacity planning; Control systems; Intelligent systems; Knowledge based systems; Laboratories; Marine animals; Mechanical engineering; Production systems; Supply and demand;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
American Control Conference, 1994
Print_ISBN :
0-7803-1783-1
Type :
conf
DOI :
10.1109/ACC.1994.751744
Filename :
751744
Link To Document :
بازگشت