DocumentCode :
3352434
Title :
Q-TAT production and CIM systems for the packaging process within IC fabrication
Author :
Iwasaki, Noriki ; Shimosato, Yoshinobu ; Tamiguchi, Kiyomi ; Shimano, Kiyoharu
Author_Institution :
Production Eng. Dept., Sharp Corp., Nara, Japan
fYear :
1995
fDate :
17-19 Sep 1995
Firstpage :
14
Lastpage :
17
Abstract :
The time required for the processes from die bonding through molding could be reduced to less than half a day by introducing improved production systems, new processes, and the CIM system. Thus, a CIM line capable of flexible small-lot production of multiple product variations could be constructed. In addition, the time required for input to the packaging process through packing was reduced to half that of the conventional system, thus achieving a QTAT line. Productivity was also enhanced to 1.5 times that of the conventional system
Keywords :
computer integrated manufacturing; flexible manufacturing systems; human resource management; integrated circuit manufacture; integrated circuit packaging; CIM systems; IC fabrication; Q-TAT production; flexible small-lot production; multiple product variations; packaging process; production systems; productivity; Automatic control; Automation; Computer integrated manufacturing; Curing; Fabrication; Lead; Microassembly; Packaging; Production equipment; Production systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing, 1995., IEEE/UCS/SEMI International Symposium on
Conference_Location :
Austin, TX
Print_ISBN :
0-7803-2928-7
Type :
conf
DOI :
10.1109/ISSM.1995.524349
Filename :
524349
Link To Document :
بازگشت