Indirect Power Supply Planning Model Based on Total Quantity Control of SO2
Author
Li, Yu ; Li, Chaoci
Author_Institution
Energy & Environ. Res. Center, North China Electr. Power Univ., Beijing
fYear
2009
fDate
27-31 March 2009
Firstpage
1
Lastpage
3
Abstract
Modeling of indirect power supply planning was performed through the reprogramming of the original coal-fired electric generating sets based on total quantity control and environmental cost. The established model could demonstrate when the desulfurizing units should be installed onto large coal-fired electric generating sets, and when the small coal-fired electric generating sets should be closed-down in a generate electricity units with SO2 emission as the most significant constraint. The resulted information in a case study indicated that the model could provide more detailed plan for the next maximum development of the generate electricity units in a new five years´ plan, with limited target of SO2 emission.
Keywords
coal; power generation control; power generation planning; SO2; coal-fired electric generating sets; desulfurizing units; environmental cost; indirect power supply planning model; total quantity control; Air pollution; Chaos; Costs; Electronic mail; Energy conservation; Investments; Power generation; Power supplies; Protection; Rain;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Engineering Conference, 2009. APPEEC 2009. Asia-Pacific
Conference_Location
Wuhan
Print_ISBN
978-1-4244-2486-3
Electronic_ISBN
978-1-4244-2487-0
Type
conf
DOI
10.1109/APPEEC.2009.4918430
Filename
4918430
Link To Document