DocumentCode :
3356290
Title :
Research on production planning and scheduling of large-piece OKP enterprises
Author :
Min, Lv ; Gang, Wang ; Ying, Che
Author_Institution :
Eng. Ind./Adv. Manuf. Technol. Center, Harbin Inst. of Technol., Harbin, China
fYear :
2010
fDate :
26-28 June 2010
Firstpage :
3020
Lastpage :
3023
Abstract :
Based on the steam turbine manufacturers, the production characteristics of large-piece OKP (One-of-a-Kind Production) enterprises is analyzed, and the controlling ideas of production planning and scheduling on plant level is proposed. Moreover, by combining heuristic algorithm based on rules with fuzzy algorithm, the formulating method of production planning and scheduling on plant level is introduced, and is used for the production control of large-piece OKP enterprises.
Keywords :
fuzzy set theory; heuristic programming; production control; production planning; scheduling; steam turbines; fuzzy algorithm; heuristic algorithm; large-piece OKP enterprises; one-of-a-kind production; plant level; production planning; production scheduling; steam turbine manufacturers; Dynamic scheduling; Finishing; Heuristic algorithms; Job shop scheduling; Manufacturing; Materials requirements planning; Production planning; Scheduling algorithm; Turbines; Uncertainty; fuzzy algorithm; heuristic algorithm; large-piece OKP enterprises; production planning and scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Mechanic Automation and Control Engineering (MACE), 2010 International Conference on
Conference_Location :
Wuhan
Print_ISBN :
978-1-4244-7737-1
Type :
conf
DOI :
10.1109/MACE.2010.5536058
Filename :
5536058
Link To Document :
بازگشت