DocumentCode
3356606
Title
Analysis of incentive mechanism considering upper limit in design fee of Chinese construction projects
Author
Pengcheng, Pan ; Lei, Zhou
Author_Institution
Dept of Civil Eng., Yanshan Univ., Qinhuangdao, China
fYear
2010
fDate
26-28 June 2010
Firstpage
5039
Lastpage
5042
Abstract
In the construction projects in China, the design fee is fixed and the designer´s positivity is restricted by this mechanism. Many scholars proposed that incentive mechanism should been introduced into bargain. That is to say, designer can get some percent profit according to their contribution. But in fact this kind of mechanism maybe causes such problem as designer take a risk in the hope of speculation. For example, designer may lower technical standards to gain a lower cost. Of cause these kinds of behavior harm the interests of owners. So In this article, an upper limit mechanism is added into bargain in order to avoid designer´s speculation. The principal-agent model is used in this article to calculate the upper limit accuratly. Then, some factors affect upper limit are discussed. Last, the new mechanism proved to be effective by the comparison between the model with upper limit and model without upper limit.
Keywords
construction industry; design engineering; incentive schemes; profitability; Chinese construction project design fee; designer speculation; incentive mechanism; principal-agent model; Civil engineering; Costs; Industrial engineering; Lagrangian functions; Reactive power; design fee; incentive mechanism; upper limit;
fLanguage
English
Publisher
ieee
Conference_Titel
Mechanic Automation and Control Engineering (MACE), 2010 International Conference on
Conference_Location
Wuhan
Print_ISBN
978-1-4244-7737-1
Type
conf
DOI
10.1109/MACE.2010.5536076
Filename
5536076
Link To Document