• DocumentCode
    3359677
  • Title

    Simulation on Dam Concrete Construction Processes Using Dynamic Resources Matching Technology

  • Author

    Liu Quan ; Hu Zhigen ; Han Qi

  • Author_Institution
    State Key Lab. of Water Resource & Hydropower Eng. Sci., Wuhan Univ., Wuhan
  • fYear
    2009
  • fDate
    27-31 March 2009
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Focusing on concrete construction process of arch dam by cable cranes, based on queued service system theory and dynamic resources matching technology, the simulation model with the core of dynamic resources allocating and matching is constructed, and then the simulation is carried on to optimize the construction processes. A sample shows that the simulation results carry more details of construction, which made by dynamic optimization model. And the time utilization of construction is optimized.
  • Keywords
    cables (mechanical); concrete; construction; cranes; dams; optimisation; cable cranes; dam concrete construction process; dynamic optimization model; dynamic resource matching technology; queued service system theory; simulation model; Analytical models; Concrete; Cranes; Hydroelectric power generation; Laboratories; Machinery; Predictive models; Queueing analysis; Resource management; Water resources;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Engineering Conference, 2009. APPEEC 2009. Asia-Pacific
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-2486-3
  • Electronic_ISBN
    978-1-4244-2487-0
  • Type

    conf

  • DOI
    10.1109/APPEEC.2009.4918761
  • Filename
    4918761