DocumentCode
3359677
Title
Simulation on Dam Concrete Construction Processes Using Dynamic Resources Matching Technology
Author
Liu Quan ; Hu Zhigen ; Han Qi
Author_Institution
State Key Lab. of Water Resource & Hydropower Eng. Sci., Wuhan Univ., Wuhan
fYear
2009
fDate
27-31 March 2009
Firstpage
1
Lastpage
4
Abstract
Focusing on concrete construction process of arch dam by cable cranes, based on queued service system theory and dynamic resources matching technology, the simulation model with the core of dynamic resources allocating and matching is constructed, and then the simulation is carried on to optimize the construction processes. A sample shows that the simulation results carry more details of construction, which made by dynamic optimization model. And the time utilization of construction is optimized.
Keywords
cables (mechanical); concrete; construction; cranes; dams; optimisation; cable cranes; dam concrete construction process; dynamic optimization model; dynamic resource matching technology; queued service system theory; simulation model; Analytical models; Concrete; Cranes; Hydroelectric power generation; Laboratories; Machinery; Predictive models; Queueing analysis; Resource management; Water resources;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Engineering Conference, 2009. APPEEC 2009. Asia-Pacific
Conference_Location
Wuhan
Print_ISBN
978-1-4244-2486-3
Electronic_ISBN
978-1-4244-2487-0
Type
conf
DOI
10.1109/APPEEC.2009.4918761
Filename
4918761
Link To Document