• DocumentCode
    3362032
  • Title

    Safety assessment study

  • Author

    Shepperd, C B

  • Author_Institution
    Siemens Transportation Systems Ltd, UK
  • fYear
    2010
  • fDate
    1-5 Nov. 2010
  • Firstpage
    319
  • Lastpage
    325
  • Abstract
    Despite the relative ease with which new trains had been accepted into service by the Route Acceptance Safety Case process mandated in Railway Group standard (RGS) GE/RT 8270 issue 1, following the introduction of new European legislation and associated UK enabling regulations, the acceptance process has now been radically revised. This paper is an attempt to show how the risk assessment process used by Siemens and developed over the last fifteen years has been applied within the framework of the new legislation.
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electric Traction Systems, 2010 IET Professional Development Course on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/ic.2010.0204
  • Filename
    6155267