DocumentCode
3362061
Title
Practical aspects of rolling stock maintenance
Author
Ross, I.
Author_Institution
c/o The IET
fYear
2010
fDate
1-5 Nov. 2010
Firstpage
337
Lastpage
355
Abstract
The paper reviews factors that affect running maintenance of electric multiple units principally in the United Kingdom. The maintenance ‘contract’ with the train operator is outlined in terms of reliability and availability statistics. The effects of human factors on train maintenance are considered. The benefits of engineering design simplicity, accessibility and standardisation are stated, accepting that these criteria may not be given priority in modern rolling stock specifications. An example of changes to depot facilities to accommodate modern rolling stock is given, and recent projects involving management of maintenance change are described. The need for knowledge transfer between design and maintenance engineers is emphasised as is the retention of basic electric traction design principles.
Keywords
Electric rolling stock maintenance;
fLanguage
English
Publisher
iet
Conference_Titel
Electric Traction Systems, 2010 IET Professional Development Course on
Conference_Location
London
Type
conf
DOI
10.1049/ic.2010.0206
Filename
6155269
Link To Document