    Study on Cost and Schedule Control in Warship Planned Maintenance

  • Author

    Xie Li ; Wei Ru Xiang ; Chen Zi Shang Chuan

  • Author_Institution
    Dept. of Equip. Econ. & Manage., Naval Univ. of Eng., Wuhan
  • fYear
    2008
  • fDate
    4-6 Nov. 2008
  • Firstpage
    87
  • Lastpage
    90
  • Abstract
    The earned value measure is introduced into the cost and schedule control of warship planned maintenance for the over budget and schedule delays problem. The flowchart and application range of earned value measure is summarized. The application procedure of the earned value measure in the cost and schedule control of warship planned maintenance is given. Then the over budget and schedule delays are analyzed quantitatively in repair of some type warship. For different instance, the concrete forecast methods of cost at completion are put forward in the date of examine, which finally proved that the application of the earned value measure in the cost and schedule control of warship maintenance is feasible and valid.
  • Keywords
    budgeting; costing; maintenance engineering; military equipment; project management; ships; cost control; earned value measure; schedule control; schedule delays problem; warship planned maintenance; Costs; Delay; Economic forecasting; Engineering management; Flowcharts; Forward contracts; Management training; Performance evaluation; Project management; Risk management; control; cost; earned value measure; planned maintenance; schedule; warship;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Risk Management & Engineering Management, 2008. ICRMEM '08. International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-0-7695-3402-2
  • Type

    conf

  • DOI
    10.1109/ICRMEM.2008.29
  • Filename
    4673205