Study on Cost and Schedule Control in Warship Planned Maintenance
Author
Xie Li ; Wei Ru Xiang ; Chen Zi Shang Chuan
Author_Institution
Dept. of Equip. Econ. & Manage., Naval Univ. of Eng., Wuhan
fYear
2008
fDate
4-6 Nov. 2008
Firstpage
87
Lastpage
90
Abstract
The earned value measure is introduced into the cost and schedule control of warship planned maintenance for the over budget and schedule delays problem. The flowchart and application range of earned value measure is summarized. The application procedure of the earned value measure in the cost and schedule control of warship planned maintenance is given. Then the over budget and schedule delays are analyzed quantitatively in repair of some type warship. For different instance, the concrete forecast methods of cost at completion are put forward in the date of examine, which finally proved that the application of the earned value measure in the cost and schedule control of warship maintenance is feasible and valid.
Keywords
budgeting; costing; maintenance engineering; military equipment; project management; ships; cost control; earned value measure; schedule control; schedule delays problem; warship planned maintenance; Costs; Delay; Economic forecasting; Engineering management; Flowcharts; Forward contracts; Management training; Performance evaluation; Project management; Risk management; control; cost; earned value measure; planned maintenance; schedule; warship;
fLanguage
English
Publisher
ieee
Conference_Titel
Risk Management & Engineering Management, 2008. ICRMEM '08. International Conference on
Conference_Location
Beijing
Print_ISBN
978-0-7695-3402-2
Type
conf
DOI
10.1109/ICRMEM.2008.29
Filename
4673205
Link To Document