    Research on Risk Assessment in Engineering Project Based on Route Analysis and Hierarchical Variable Weight Fuzzy Evaluation

  • Author

    Huang, Yuansheng ; Tian, Chengfang

  • Author_Institution
    Dept. of Economic Manage., North China Electr. Power Univ., Baoding
  • fYear
    2008
  • fDate
    4-6 Nov. 2008
  • Firstpage
    478
  • Lastpage
    481
  • Abstract
    The paper proposes the method of risk assessment based on route analysis and variable weight fuzzy evaluation. Firstly, it is on the basis of route analysis, and mines each stage and its critical factors of engineering project; and analyzes each uncertainly measuring with the method of fuzzy comprehensive evaluation; then solves the deferring characteristic of risk in engineering project using variable weight theory to improve the accuracy of risk evaluation. Finally, an example is used to prove the method is effective and practical.
  • Keywords
    fuzzy set theory; project management; risk management; engineering project; fuzzy comprehensive evaluation; hierarchical variable weight fuzzy evaluation; risk assessment; route analysis; Design engineering; Engineering management; Investments; Power engineering and energy; Power generation economics; Project management; Research and development management; Risk analysis; Risk management; Uncertainty; analytic hierarchy process (AHP); hierarchical variable weight; risk in engineering project; route analysis;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Risk Management & Engineering Management, 2008. ICRMEM '08. International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-0-7695-3402-2
  • Type

    conf

  • DOI
    10.1109/ICRMEM.2008.34
  • Filename
    4673276