• DocumentCode
    3366873
  • Title

    Method of prioritizing the equipment recovery to maintain high productivity

  • Author

    Ishii, Yoshiriho ; Chida, Akihiro ; Watanabe, Shigetaka

  • Author_Institution
    Simulation & Dispatch Sec Aizuwakamatsu City, Japan
  • fYear
    1999
  • fDate
    1999
  • Firstpage
    85
  • Lastpage
    88
  • Abstract
    A prime factor of the production loss is a plan, and non-plan stop of equipment. However, if the equipment obstruction degree can be calculated, and the thing to restore large equipment of the obstruction degree prior be done, the obstruction degree can be made the most small. We developed a system that determines the recovery priority to improve production efficiency. The system obtains the instantaneous loss from changing work-in-process, calculates the optimum recovery priority in a short period based on the obtained value, and gives resource entry instructions to appropriate places
  • Keywords
    integrated circuit manufacture; equipment recovery prioritization; obstruction degree; planning; production efficiency; productivity; resource entry instruction; semiconductor manufacturing; work-in-process; Ambient intelligence; Cities and towns; Displays; History; Probability distribution; Production control; Production systems; Productivity; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing Conference Proceedings, 1999 IEEE International Symposium on
  • Conference_Location
    Santa Clara, CA
  • ISSN
    1523-553X
  • Print_ISBN
    0-7803-5403-6
  • Type

    conf

  • DOI
    10.1109/ISSM.1999.808744