DocumentCode :
3367817
Title :
Capacity planning for a twin fab
Author :
Chen, James C. ; Fan, Yang-Chih ; Wang, J.Y. ; Lin, T.K. ; Leea, S.H. ; Wu, S.C. ; Lan, Y.J.
Author_Institution :
Dept. of Ind. Eng., Chung Yuan Christian Univ., Chung Li, Taiwan
fYear :
1999
fDate :
1999
Firstpage :
317
Lastpage :
320
Abstract :
A capacity planning system (CPS) is developed for a twin fab based on the assumption of infinite capacity. CPS consists of three major modules: WIP-pulling module, workload allocation and accumulation module, and wafer release module. To meet the master production schedule (MPS), the WIP-pulling module pulls WIP from the end of the process routine. The workload allocation and accumulation module then calculates the expected equipment loading in different time periods. If WIP cannot satisfy the MPS requirement, the wafer release module is used to determine the planned wafer start time and the start production fab. On the basis of experimental design, simulation results show that CPS can smooth equipment loading in different time periods and balance the workload between fabs
Keywords :
integrated circuit manufacture; manufacturing resources planning; production control; WIP-pulling module; infinite capacity; master production schedule; process routine; semiconductor wafer fabrication; twin fab capacity planning system; wafer release module; work-in-progress; workload allocation and accumulation module; Capacity planning; Preventive maintenance; Scheduling; Testing; Tires;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing Conference Proceedings, 1999 IEEE International Symposium on
Conference_Location :
Santa Clara, CA
ISSN :
1523-553X
Print_ISBN :
0-7803-5403-6
Type :
conf
DOI :
10.1109/ISSM.1999.808799
Filename :
808799
Link To Document :
بازگشت