DocumentCode
3372221
Title
Simulation of liquid metal logistics in primary aluminum industry
Author
Pablo, D. ; Racca, P.P. ; Bustelo, C.
Author_Institution
Paragontech Group, Rosario, Argentina
fYear
2012
fDate
9-12 Dec. 2012
Firstpage
1
Lastpage
11
Abstract
Production planning in the primary aluminum industry is a critical task, due to heavy imbalances among the main processes. As liquid production (reduction) has a very continuous and stable output, solidification at different lines have different operational paths (batch/continuous), shutdowns and variations in rates. Due to material´s nature (hot liquid metal), it is not possible to maintain a buffer to absorb those imbalances. An adequate logistics planning for distributing liquid metal has to accomplish the solidification plan with an adequate usage of resources. In this paper we present the application of a simulation model to identify the main bottlenecks in the process, analyze dynamic system behavior, apply heuristics balancing algorithms and validate possible solutions for increasing casting capacity. The simulation model was implemented at Aluar´s plant.
Keywords
aluminium industry; casting; liquid metals; logistics; production engineering computing; production planning; casting capacity; dynamic system behavior; heuristics balancing algorithms; liquid metal logistics; liquid production; logistics planning; primary aluminum industry; production planning; solidification plan; Agricultural machinery; Furnaces; Liquids; Logistics; Metals; Transportation;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference (WSC), Proceedings of the 2012 Winter
Conference_Location
Berlin
ISSN
0891-7736
Print_ISBN
978-1-4673-4779-2
Electronic_ISBN
0891-7736
Type
conf
DOI
10.1109/WSC.2012.6464984
Filename
6464984
Link To Document