DocumentCode :
3377091
Title :
Diagnostics “after” prognostics: Steps toward a prognostics-informed analysis of system diagnostic behavior
Author :
Gould, E.
Author_Institution :
DSI Int., Orange, CA, USA
fYear :
2011
fDate :
20-23 June 2011
Firstpage :
1
Lastpage :
7
Abstract :
Although substantial effort has been spent developing new metrics for the evaluation of prognostic performance, relatively little attention has been directed toward ways in which existing systems analysis practices should be modified to incorporate knowledge from Prognostic Health Management. This paper discusses an approach to modifying system design assessments (such as Reliability, Testability and Maintainability) based on parameters provided within System Prognostic Requirements.
Keywords :
condition monitoring; defence industry; maintenance engineering; project management; reliability; army; defense development project; maintainability; prognostic health management; prognostics-informed analysis; reliability; system design assessment; system diagnostic behavior; system prognostic requirement; testability; Accuracy; Maintenance engineering; Measurement; Mission critical systems; Probability; Reliability engineering; Metrics; Prognostics; Requirements; Testability;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Prognostics and Health Management (PHM), 2011 IEEE Conference on
Conference_Location :
Montreal, QC
Print_ISBN :
978-1-4244-9828-4
Type :
conf
DOI :
10.1109/ICPHM.2011.6024345
Filename :
6024345
Link To Document :
بازگشت