Title :
Application of coefficient of variation and osculating value method in bidding evaluation of power construction project
Author :
Wei, Li ; Wei-dong, Dong ; Ya-nan, Yuan ; Dan, Wang
Author_Institution :
Dept. of Econ. & Manage., North China Electr. Power Univ., Baoding, China
Abstract :
In this paper, the calculation principle of Osculating Value Method was used, calculate the weights with the coefficient of variation method and Point out the relative importance of organization design in bidding evaluation of power construction projects, to establish the integrated evaluation model based on coefficient of variation and osculating value method and provide a quantitative analysis method of simple and reasonable for the evaluation for the project. Examples show that this method is simple, scientific and rational.
Keywords :
PERT; construction industry; decision making; power plants; project management; tendering; bidding evaluation; coefficient of variation method; organization design; osculating value method; power construction project; Biomedical engineering; Conference management; Costs; Design engineering; Energy management; Engineering management; Power engineering and energy; Power generation economics; Power system management; Project management; bidding Evaluation; coefficient of variation; osculating value method; power projects;
Conference_Titel :
BioMedical Information Engineering, 2009. FBIE 2009. International Conference on Future