Application of coefficient of variation and osculating value method in bidding evaluation of power construction project
Author
Wei, Li ; Wei-dong, Dong ; Ya-nan, Yuan ; Dan, Wang
Author_Institution
Dept. of Econ. & Manage., North China Electr. Power Univ., Baoding, China
fYear
2009
fDate
13-14 Dec. 2009
Firstpage
529
Lastpage
531
Abstract
In this paper, the calculation principle of Osculating Value Method was used, calculate the weights with the coefficient of variation method and Point out the relative importance of organization design in bidding evaluation of power construction projects, to establish the integrated evaluation model based on coefficient of variation and osculating value method and provide a quantitative analysis method of simple and reasonable for the evaluation for the project. Examples show that this method is simple, scientific and rational.
Keywords
PERT; construction industry; decision making; power plants; project management; tendering; bidding evaluation; coefficient of variation method; organization design; osculating value method; power construction project; Biomedical engineering; Conference management; Costs; Design engineering; Energy management; Engineering management; Power engineering and energy; Power generation economics; Power system management; Project management; bidding Evaluation; coefficient of variation; osculating value method; power projects;
fLanguage
English
Publisher
ieee
Conference_Titel
BioMedical Information Engineering, 2009. FBIE 2009. International Conference on Future
Conference_Location
Sanya
Print_ISBN
978-1-4244-4690-2
Electronic_ISBN
978-1-4244-4692-6
Type
conf
DOI
10.1109/FBIE.2009.5405773
Filename
5405773
Link To Document