DocumentCode :
337794
Title :
Time constrained module scheduling with global resource sharing
Author :
Jáschke, Christoph ; Beckmann, Friedrich ; Laur, Rainer
Author_Institution :
Inst. for Electromagn. Theor. & Microelectron., Bremen Univ., Germany
fYear :
1999
fDate :
1999
Firstpage :
210
Lastpage :
216
Abstract :
Commonly used scheduling algorithms in high-level synthesis only accept one process at a time and are not capable of sharing resources across process boundaries. This results in the usage of at least one resource per operation type and process. A new method is proposed in order to overcome these restrictions and to share high-cost or limited resources within a process group. This allows the use of less than one resource per operation type and process, while keeping the mutual independence of the involved processes. The method represents an extension of general scheduling algorithms and is not tied to a specific algorithm. It is applied to the time constrained force-directed scheduling algorithm. For this the scope of the scheduling is extended to the processes of the whole system and a two-part modification is applied to the original procedure. A multi-process example illustrates the resource sharing capabilities of the extension
Keywords :
high level synthesis; real-time systems; scheduling; force-directed scheduling algorithm; global resource sharing; high-level synthesis; multi-process example; mutual independence; process boundaries; time constrained module scheduling; two-part modification; Hardware; High level synthesis; Iterative algorithms; Merging; Microelectronics; Real time systems; Resource management; Scheduling algorithm; Synchronization; Time factors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Design, Automation and Test in Europe Conference and Exhibition 1999. Proceedings
Conference_Location :
Munich
Print_ISBN :
0-7695-0078-1
Type :
conf
DOI :
10.1109/DATE.1999.761124
Filename :
761124
Link To Document :
بازگشت