DocumentCode
337794
Title
Time constrained module scheduling with global resource sharing
Author
Jáschke, Christoph ; Beckmann, Friedrich ; Laur, Rainer
Author_Institution
Inst. for Electromagn. Theor. & Microelectron., Bremen Univ., Germany
fYear
1999
fDate
1999
Firstpage
210
Lastpage
216
Abstract
Commonly used scheduling algorithms in high-level synthesis only accept one process at a time and are not capable of sharing resources across process boundaries. This results in the usage of at least one resource per operation type and process. A new method is proposed in order to overcome these restrictions and to share high-cost or limited resources within a process group. This allows the use of less than one resource per operation type and process, while keeping the mutual independence of the involved processes. The method represents an extension of general scheduling algorithms and is not tied to a specific algorithm. It is applied to the time constrained force-directed scheduling algorithm. For this the scope of the scheduling is extended to the processes of the whole system and a two-part modification is applied to the original procedure. A multi-process example illustrates the resource sharing capabilities of the extension
Keywords
high level synthesis; real-time systems; scheduling; force-directed scheduling algorithm; global resource sharing; high-level synthesis; multi-process example; mutual independence; process boundaries; time constrained module scheduling; two-part modification; Hardware; High level synthesis; Iterative algorithms; Merging; Microelectronics; Real time systems; Resource management; Scheduling algorithm; Synchronization; Time factors;
fLanguage
English
Publisher
ieee
Conference_Titel
Design, Automation and Test in Europe Conference and Exhibition 1999. Proceedings
Conference_Location
Munich
Print_ISBN
0-7695-0078-1
Type
conf
DOI
10.1109/DATE.1999.761124
Filename
761124
Link To Document