DocumentCode :
3378553
Title :
Floor inventory tracking of a Kanban production system
Author :
Farahmand, Kambiz ; Heemsbergen, Brian L.
Author_Institution :
Dept. of Mech. & Ind. Eng., Texas A&M Univ., Kingsville, TX, USA
fYear :
1994
fDate :
11-14 Dec. 1994
Firstpage :
1027
Lastpage :
1034
Abstract :
A model was developed for tracking production floor inventory for a Kanban manufacturing production system. The production (Kanban) parameters used include percent loading, percent availability, yield, lead time, batch time, and cycle time. The model was constructed for a discrete, non continuous simulation of a multi stage dual-card Kanban production system. The performance of the model was monitored by tracking WIP, orders completed, average time in the system, and the production throughput in the JIT/Kanban production environment. The results and the evaluation technique will prove useful in tracking production floor inventory and selection of the right Kanban technique to implement in a given manufacturing process. It will also provide valuable information for anticipating production capabilities of a Kanban system before actual implementation using the simulation technique presented in this paper.
Keywords :
computer aided production planning; digital simulation; Kanban production system; batch time; cycle time; floor inventory tracking; lead time; manufacturing process; manufacturing production system; percent availability; percent loading; production capabilities; production floor inventory; yield; Cities and towns; Containers; Delay; Electric breakdown; Flow production systems; Flowcharts; Inventory control; Production systems; Statistical distributions; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Simulation Conference Proceedings, 1994. Winter
Print_ISBN :
0-7803-2109-X
Type :
conf
DOI :
10.1109/WSC.1994.717484
Filename :
717484
Link To Document :
بازگشت