• DocumentCode
    3378553
  • Title

    Floor inventory tracking of a Kanban production system

  • Author

    Farahmand, Kambiz ; Heemsbergen, Brian L.

  • Author_Institution
    Dept. of Mech. & Ind. Eng., Texas A&M Univ., Kingsville, TX, USA
  • fYear
    1994
  • fDate
    11-14 Dec. 1994
  • Firstpage
    1027
  • Lastpage
    1034
  • Abstract
    A model was developed for tracking production floor inventory for a Kanban manufacturing production system. The production (Kanban) parameters used include percent loading, percent availability, yield, lead time, batch time, and cycle time. The model was constructed for a discrete, non continuous simulation of a multi stage dual-card Kanban production system. The performance of the model was monitored by tracking WIP, orders completed, average time in the system, and the production throughput in the JIT/Kanban production environment. The results and the evaluation technique will prove useful in tracking production floor inventory and selection of the right Kanban technique to implement in a given manufacturing process. It will also provide valuable information for anticipating production capabilities of a Kanban system before actual implementation using the simulation technique presented in this paper.
  • Keywords
    computer aided production planning; digital simulation; Kanban production system; batch time; cycle time; floor inventory tracking; lead time; manufacturing process; manufacturing production system; percent availability; percent loading; production capabilities; production floor inventory; yield; Cities and towns; Containers; Delay; Electric breakdown; Flow production systems; Flowcharts; Inventory control; Production systems; Statistical distributions; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference Proceedings, 1994. Winter
  • Print_ISBN
    0-7803-2109-X
  • Type

    conf

  • DOI
    10.1109/WSC.1994.717484
  • Filename
    717484