DocumentCode :
3386812
Title :
Today´s LMS
Author :
Sell, Richard F.
Author_Institution :
Flow Logics, USA
fYear :
1997
fDate :
10-12 Sep 1997
Firstpage :
55
Lastpage :
57
Abstract :
Today´s LMS (LMS2) is a real-time transaction-based finite scheduler that uses goal advocates to avoid resource starvation, increase on-time deliveries and reduce setups. It has been recognized by industry and academic professionals for its state-of-the-art concepts and implementation. It combines advanced decision technologies to generate a dispatch list to control manufacturing WIP flow
Keywords :
decision support systems; integrated circuit manufacture; mathematical programming; production control; real-time systems; LMS2; decision technologies; dispatch list; goal advocates; manufacturing WIP flow; on-time deliveries; real-time transaction-based finite scheduler; semiconductor process line; Costs; Data analysis; Information analysis; Job shop scheduling; Least squares approximation; Logic; Manufacturing industries; Semiconductor device manufacture; Spatial databases; Transaction databases;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Advanced Semiconductor Manufacturing Conference and Workshop, 1997. IEEE/SEMI
Conference_Location :
Cambridge, MA
ISSN :
1078-8743
Print_ISBN :
0-7803-4050-7
Type :
conf
DOI :
10.1109/ASMC.1997.630705
Filename :
630705
Link To Document :
بازگشت