DocumentCode :
3387350
Title :
Investigation of 115 kV capacitor bank failure during switching in Chiang Mai 3 substation
Author :
Kanitpanyacharoen, Sarawut ; Premrudeepreechacharn, Suttichai
Author_Institution :
Northern Region Oper. Div., Electr. Generating Authority of Thailand, Chiang Mai, Thailand
fYear :
2011
fDate :
4-6 Aug. 2011
Firstpage :
1
Lastpage :
5
Abstract :
In this contribution, the investigation on the failures of 115-kV capacitor banks during switching in Chiang Mai 3 substation is presented. The switching transient is caused by energizing an isolated bank and back-to-back switching. Close time of circuit breaker for energizing capacitor bank, system loads, and power factors are varied in the simulations by PSCAD/EMTDC program to determine the causes of maximum inrush current and overvoltage. Simulation results of energizing isolated bank suggest that the maximum inrush currents occurs with a higher system load while the maximum overvoltage occurs in a lower system load. The back-to-back switching sequence of capacitor banks has given different results. Method No.l is the most optimal sequence for energizing capacitor bank and is most likely to minimize the effects of back-to-back switching.
Keywords :
capacitor storage; circuit breakers; fault diagnosis; power capacitors; power factor; substations; Chiang Mai 3 substation; PSCAD-EMTDC program; back-to-back switching sequence; capacitor bank failure; circuit breaker; energizing capacitor bank; isolated bank switching; maximum inrush current; maximum inrush overvoltage; power factors; switching transient; system loads; voltage 115 kV; Capacitors; Integrated circuit modeling; Substations; Surges; Switches; Transient analysis; Voltage control;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
North American Power Symposium (NAPS), 2011
Conference_Location :
Boston, MA
Print_ISBN :
978-1-4577-0417-8
Electronic_ISBN :
978-1-4577-0418-5
Type :
conf
DOI :
10.1109/NAPS.2011.6025102
Filename :
6025102
Link To Document :
بازگشت