  • Abstract
    The efficiency of asset utilization is one of the core contents of Smart Grid. This paper proposes the line Power Flow Duration Curve (PFDC) as a tool in the process of transmission cost allocation. The impact of the power flow duration time on the transmission asset utilization can be taken into account effectively. An implementation mechanism is designed. The case studies based on the IEEE 30-bus and 118-bus system demonstrate that the transmission cost can be allocated much more reasonably by the proposed method.
  • Keywords
    costing; load flow; power transmission economics; smart power grids; IEEE 118-bus system; IEEE 30-bus system; implementation mechanism; line PFDC; line power flow duration curve; power flow duration time; smart grid; transmission asset utilization efficiency; transmission cost allocation method; Educational institutions; Load flow; Power transmission lines; Pricing; Resource management; Smart grids; Smart Grid; Transmission cost allocation; efficiency of asset utilization; line power flow duration curve (PFDC); power flow duration time;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Innovative Smart Grid Technologies (ISGT Europe), 2012 3rd IEEE PES International Conference and Exhibition on
  • Conference_Location
    Berlin
  • ISSN
    2165-4816
  • Print_ISBN
    978-1-4673-2595-0
  • Electronic_ISBN
    2165-4816
  • Type

    conf

  • DOI
    10.1109/ISGTEurope.2012.6465847
  • Filename
    6465847