Title :
The feasibility analysis of mine water source heat pump system in Xingtai Colliery
Author :
Wang, Jinggang ; Gao, Xiaoxia ; Du, Hongbiao
Author_Institution :
Coll. of Urban Constr., Hebei Univ. of Eng., Handan, China
Abstract :
In the coal mine production, it will produce a lot of gushing water, which is rich in low-grade energy. It is so pity that the water is often treated as waste water. This article combined the mine water with water source heat pump and developed a new type of heat pump system which is called mine water source heat pump system. The systems can recovery the heat of the mine water maximally. Take an office building in Xingtai Colliery for example; a detail technical analysis of the mine water source heat pump system was conducted before the system designing. At the same time, a detailed analysis of economic and environmental energy benefits was also conducted. The results showed that: mine water source heat pump heating and cooling works well, with significant economic and environmental benefits, should be widely used.
Keywords :
coal; heat pumps; mining; Xingtai Colliery; coal mine production; economic energy; environmental energy; feasibility analysis; mine water source heat pump system; waste water; Buildings; Cooling; Environmental economics; Heat pumps; Heat recovery; Power generation economics; Production; Wastewater treatment; Water heating; Water resources; economic and technical analysis; energysaving and emission reduction; heat recovery; mine gushing water; mine water source heat pump;
Conference_Titel :
Power Electronics and Intelligent Transportation System (PEITS), 2009 2nd International Conference on
Conference_Location :
Shenzhen
Print_ISBN :
978-1-4244-4544-8
DOI :
10.1109/PEITS.2009.5406836