• DocumentCode
    3392679
  • Title

    Productivity improvement in a semiconductor wafer fab through transparent scheduling techniques

  • Author

    Johal, Sumer ; Everton, John

  • Author_Institution
    Analogue Devices Inc., Wilmington, MA, USA
  • fYear
    1997
  • fDate
    10-12 Sep 1997
  • Firstpage
    201
  • Abstract
    Summary form only given. This approach is designed for accuracy of results based on factory (discrete-event) simulations, malleability and transferability to any manufacturing scenario and market demand and transparency to the “human-factor” during the implementation phases. An information tracking framework is developed to integrate this effort with the shop-floor. Dynamic, real-time, discrete event simulations are used to determine the correct scheduling of factory resource. Constrained equipment are allocated a certain WIP capacity based on the simulation expectations and this WIP is regulated through a “drum-buffer-rope” approach linking one constraint to another for various process flows. These inputs are then continuously fed into a “virtual-factory” simulation-based scheduling system which feeds the Manufacturing Execution System (MES/CAM) with the correct sequence of lots to run on any equipment at any time. All this is accomplished in a finite, short-interval time and is a continuous improvement-based technique. The core factory simulation model used by the computer-generated schedules is thoroughly validated prior to any usage and is kept updated of the current factory scenario through a real-time interface to the MES system. This approach not only greatly reduces the cycle times of each process flow by regulating WIP and intelligent “push-pull” techniques, it also improves the On-Time Delivery (OTD) performance of the wafer fab. The “push-pull” is done completely transparent to the factory floor
  • Keywords
    discrete event simulation; human factors; human resource management; integrated circuit manufacture; production control; semiconductor process modelling; WIP capacity; computer-generated schedules; cycle times; drum-buffer-rope approach; factory discrete-event simulations; factory resource; factory simulation model; human-factor; improvement-based technique; information tracking framework; manufacturing execution system; manufacturing scenario; on-time delivery performance; process flow; process flows; productivity improvement; push-pull techniques; real-time interface; semiconductor wafer fab; transferability; transparent scheduling techniques; virtual-factory; Computational modeling; Discrete event simulation; Dynamic scheduling; Job shop scheduling; Joining processes; Processor scheduling; Production facilities; Productivity; Semiconductor device manufacture; Virtual manufacturing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Semiconductor Manufacturing Conference and Workshop, 1997. IEEE/SEMI
  • Conference_Location
    Cambridge, MA
  • ISSN
    1078-8743
  • Print_ISBN
    0-7803-4050-7
  • Type

    conf

  • DOI
    10.1109/ASMC.1997.630734
  • Filename
    630734