DocumentCode :
3394056
Title :
Flaws in Generation Scheduling in Iran Electricity Market from the Viewpoint of Competition Principal
Author :
Rahmati, I. ; Delshad, M. Modiri
Author_Institution :
Market Design & Dev. Group, Minist. of Energy, Tehran, Iran
fYear :
2012
fDate :
27-29 March 2012
Firstpage :
1
Lastpage :
4
Abstract :
Most of countries have started restructuring process as the salvation route of electricity industry. In the new environment, competition is a fundamental key and it is well known that in any competition, fairness is the major concern of the players. Generally, competition in power system has been started from generation sector, and winners of this competition are chosen via Unit commitment procedure which is supposed to be fair. In Iran central market, Unit Commitment procedure is an optimization problem constrained by some technical limitations including unit operational limitations, grid limitation and reliability requirements. This paper discusses how in Iran Electricity Market the unit constraints affect Unit Commitment result and argues whether these constraints are dealt in a fair manner or not.
Keywords :
optimisation; power generation dispatch; power generation scheduling; power markets; power system economics; Iran electricity market; competition principal; generation scheduling flaws; optimization problem; power system competition; unit commitment procedure; Economics; Electricity supply industry; Generators; Optimization; Power generation; Power systems;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Engineering Conference (APPEEC), 2012 Asia-Pacific
Conference_Location :
Shanghai
ISSN :
2157-4839
Print_ISBN :
978-1-4577-0545-8
Type :
conf
DOI :
10.1109/APPEEC.2012.6307414
Filename :
6307414
Link To Document :
بازگشت