DocumentCode :
3394513
Title :
Feasibility intervals for the deadline driven scheduler with arbitrary deadlines
Author :
Goossens, Joël ; Devillers, Raymond
Author_Institution :
Deot. d´´Inf., Univ. Libre de Bruxelles, Belgium
fYear :
1999
fDate :
1999
Firstpage :
54
Lastpage :
61
Abstract :
In this paper, we extend the determination of feasibility intervals to task sets with arbitrary deadlines, both in the synchronous and the asynchronous case. Meanwhile we also improve the arguments and results generally found in the literature
Keywords :
processor scheduling; real-time systems; arbitrary deadlines; asynchronous case; deadline driven scheduler; feasibility intervals; synchronous case; Computational modeling; Delay effects; Dynamic scheduling; Real time systems; System testing; Timing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Real-Time Computing Systems and Applications, 1999. RTCSA '99. Sixth International Conference on
Conference_Location :
Hong Kong
Print_ISBN :
0-7695-0306-3
Type :
conf
DOI :
10.1109/RTCSA.1999.811193
Filename :
811193
Link To Document :
بازگشت