• DocumentCode
    3410458
  • Title

    Study on a new grey CPM under incomplete information

  • Author

    Zhao, Qiang-Qiang ; Chen, Hong-Zhuan ; Yu, Bin

  • Author_Institution
    Sch. of Econ. & Manage., Nanjing Univ. of Aeronaut. & Astronaut., Nanjing, China
  • fYear
    2009
  • fDate
    10-12 Nov. 2009
  • Firstpage
    373
  • Lastpage
    377
  • Abstract
    The operation of grey numbers is a basic problem of Grey System Theory. Considering the situation of the increase of the grey critical procedures when we use the classic grey number to calculate under deficiencies in the information, the paper made use of standard grey numbers and classic mathematic calculation methods to get the grey critical path, building a new grey critical path method to identify and distinguish between the different natures of the critical paths and improve the effect of GCPM under deficiencies in the information. Then people can take different measures to different critical procedures to ensure the time limit and make the best use of materials. Through the study of a case, the paper validated the effectiveness of the model.
  • Keywords
    critical path analysis; grey systems; information theory; classic grey number; classic mathematic calculation method; grey critical path; grey numbers operation; grey system theory; incomplete information; Extraterrestrial measurements; Fuzzy set theory; Helium; Intelligent systems; Lakes; Mathematics; Path planning; Resource management; Time measurement; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Grey Systems and Intelligent Services, 2009. GSIS 2009. IEEE International Conference on
  • Conference_Location
    Nanjing
  • Print_ISBN
    978-1-4244-4914-9
  • Electronic_ISBN
    978-1-4244-4916-3
  • Type

    conf

  • DOI
    10.1109/GSIS.2009.5408289
  • Filename
    5408289