DocumentCode :
3415276
Title :
Lifting structures to increase groundline clearances
Author :
Reisdorff, Robert A.
fYear :
2003
fDate :
6-10 April 2003
Firstpage :
87
Lastpage :
94
Abstract :
Deregulation within the electric utility industry is forcing many companies to stretch the capacities of their mature transmission lines. No longer are companies in control of new generation locations or capacities. Their mission has changed from supplying electricity to regional customer to that of the movement of power over their grid. Once the RTOs (regional transmission operators) are in place, there will be even more pressure to maximize the thermal capacity of existing transmission lines. The actual cost of line outages for maintenance of rebuild work will make many present day work procedures obsolete. Thus, the industry is changing to methods of safely increasing the existing structure heights without removing the line from service. One such method is the PhaseRaiser® System.
Keywords :
earthing; maintenance engineering; power overhead lines; PhaseRaiser System; electric utility industry; groundline clearances increase; lifting structures; line outages costs; maintenance; mature transmission lines; regional transmission operators; thermal capacity maximisation; Costs; Electrical equipment industry; Electricity supply industry; Electricity supply industry deregulation; Power generation; Power industry; Power transmission lines; Structural engineering; Systems engineering and theory; Thermal factors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Construction, Operation and Live-Line Maintenance, 2003. 2003 IEEE ESMO. 2003 IEEE 10th International Conference on
Print_ISBN :
0-7803-7917-9
Type :
conf
DOI :
10.1109/TDCLLM.2003.1196473