Title :
Conductor cable substitution using the live line technique
Author :
Mendes, Roberto Roquelaue P ; Braga, Monalisa Loureiro ; Santos, Nilton Cezar Gois ; Pinheiro, Mario Jose Costa
Abstract :
This paper describes the execution of a conductor cable replacement of 4.5 km of a 138 kV transmission line in the state of Bahia, which has its right of way occupied by houses. The height of the conductor was low and it had the possibility of breaking of an energized conductor over the houses. There were many operational difficulties that determined that this service had to be done using live line technique, and therefore COELBA contracted HOT LINE to execute this unique service.
Keywords :
maintenance engineering; overhead line conductors; power overhead lines; 138 kV; 4.5 km; Bahia; COELBA; HOT LINE; conductor cable replacement; conductor cable substitution; conductor height; live line technique; right of way; transmission line; Cities and towns; Conductors; Costs; Displays; Fatigue; Power cables; Power transmission lines; Reliability engineering; Substations; Thermal conductivity;
Conference_Titel :
Transmission and Distribution Construction, Operation and Live-Line Maintenance, 2003. 2003 IEEE ESMO. 2003 IEEE 10th International Conference on
Print_ISBN :
0-7803-7917-9
DOI :
10.1109/TDCLLM.2003.1196475