DocumentCode
3417859
Title
Vehicle scheduling and dispatching of ready mixed concrete
Author
Zhang, Yang ; Li, Menglei ; Liu, Zhenyuan
Author_Institution
Dept. of Control Sci. & Eng., Huazhong Univ. of Sci. & Technol., Wuhan, China
fYear
2011
fDate
19-21 Oct. 2011
Firstpage
465
Lastpage
472
Abstract
The aim of this paper is to present an approach to improve the operation of ready mixed concrete production and to decrease the cost of the whole delivery process. In the paper, description about the ready mixed concrete industry is firstly demonstrated. And the peculiar characteristics of ready mixed concrete which make the dispatching problem different from traditional vehicle routing problem are described in detail. Then based on the existing research, one mathematical model of the vehicles dispatching of ready mixed concrete with hard time windows is developed. Vehicles mentioned in this paper are composed of two parts: one is the mixer vehicle used for only delivering concrete and the other is the pump, utilized for concrete unloading and casting. In the model, special focus is given to the pump. At last, one approach applying genetic algorithm is presented, followed by some simulation results.
Keywords
cement industry; concrete; cost reduction; dispatching; genetic algorithms; pumps; scheduling; transportation; concrete casting; concrete unloading; cost reduction; genetic algorithm; hard time windows; mixer vehicle; pump; ready mixed concrete industry; ready mixed concrete production; vehicle dispatching; vehicle routing problem; vehicle scheduling; Casting; Concrete; Dispatching; Instruments; Loading; Vehicles;
fLanguage
English
Publisher
ieee
Conference_Titel
Advanced Computational Intelligence (IWACI), 2011 Fourth International Workshop on
Conference_Location
Wuhan
Print_ISBN
978-1-61284-374-2
Type
conf
DOI
10.1109/IWACI.2011.6160052
Filename
6160052
Link To Document