DocumentCode :
3418305
Title :
A continuous operations workschedule implementation
Author :
Dunki-Jacobs, Raymond P.
Author_Institution :
IBM Technol. Products, Essex Junction, VT, USA
fYear :
1992
fDate :
30 Sep-1 Oct 1992
Firstpage :
165
Lastpage :
170
Abstract :
IBM´S semiconductor facility near Burlington, Vermont, adopted continuous operation (ContOps) in 1990 by implementing a variation of the 12-h work schedule for their production employees. The author discusses that work schedule and how it was implemented. The foundation studies that proved the business need, the analysis of work schedule alternatives, the key business measurements, and the personnel relations activities required for each phase of the changeover are discussed. Some of the lessons learned, including what to expect (and not expect) from implementing a ContOps work schedule, are reviewed. Concepts and principles are presented in broad terms to facilitate the conversion to ContOps for any enterprise
Keywords :
economics; integrated circuit manufacture; personnel; production control; semiconductor device manufacture; IBM Burlington; continuous operations; personnel relations activities; production employees; semiconductor facility; work schedule; workschedule implementation; Companies; Costs; Defense industry; Investments; Job shop scheduling; Petroleum industry; Production; Textile industry; Textile technology; Workstations;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Advanced Semiconductor Manufacturing Conference and Workshop, 1992. ASMC 92 Proceedings. IEEE/SEMI 1992
Conference_Location :
Cambridge, MA
Print_ISBN :
0-7803-0740-2
Type :
conf
DOI :
10.1109/ASMC.1992.253800
Filename :
253800
Link To Document :
بازگشت