DocumentCode
3419556
Title
Program update-Amtrak´s high speed trainset program
Author
Bell, John G. ; Annechini, Richard J.
fYear
1997
fDate
18-20 Mar 1997
Firstpage
109
Lastpage
113
Abstract
Amtrak´s High Speed Trainset Project Office is responsible for overseeing the design, manufacture and delivery of a fleet of twelve to eighteen high-speed trainsets, fifteen high-speed electric locomotives and state-of-the-art maintenance facilities in Washington, New York and Boston (USA). In addition, the Project Office will oversee the implementation of a management services maintenance contract where the carbuilder will be responsible for all maintenance of the trainsets for an initial period of 10 years. The purpose of this paper is to provide an overview of the high-speed trainset program, including the history of the program, the current status of the various program elements, and the schedule to start revenue service. In addition, the authors intend to briefly review the technology being used on the trainset and locomotive systems
Keywords
electric locomotives; maintenance engineering; project engineering; railways; Amtrak; USA; electric railways; high-speed electric locomotives; high-speed trainsets; maintenance facilities; project update; state-of-the-art; Contracts; Costs; Design engineering; Engineering management; History; Inspection; Job shop scheduling; Manufacturing; Project management; Proposals;
fLanguage
English
Publisher
ieee
Conference_Titel
Railroad Conference, 1997., Proceedings of the 1997 IEEE/ASME Joint
Conference_Location
Boston, MA
Print_ISBN
0-7803-3854-5
Type
conf
DOI
10.1109/RRCON.1997.581391
Filename
581391
Link To Document