• DocumentCode
    3419556
  • Title

    Program update-Amtrak´s high speed trainset program

  • Author

    Bell, John G. ; Annechini, Richard J.

  • fYear
    1997
  • fDate
    18-20 Mar 1997
  • Firstpage
    109
  • Lastpage
    113
  • Abstract
    Amtrak´s High Speed Trainset Project Office is responsible for overseeing the design, manufacture and delivery of a fleet of twelve to eighteen high-speed trainsets, fifteen high-speed electric locomotives and state-of-the-art maintenance facilities in Washington, New York and Boston (USA). In addition, the Project Office will oversee the implementation of a management services maintenance contract where the carbuilder will be responsible for all maintenance of the trainsets for an initial period of 10 years. The purpose of this paper is to provide an overview of the high-speed trainset program, including the history of the program, the current status of the various program elements, and the schedule to start revenue service. In addition, the authors intend to briefly review the technology being used on the trainset and locomotive systems
  • Keywords
    electric locomotives; maintenance engineering; project engineering; railways; Amtrak; USA; electric railways; high-speed electric locomotives; high-speed trainsets; maintenance facilities; project update; state-of-the-art; Contracts; Costs; Design engineering; Engineering management; History; Inspection; Job shop scheduling; Manufacturing; Project management; Proposals;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Railroad Conference, 1997., Proceedings of the 1997 IEEE/ASME Joint
  • Conference_Location
    Boston, MA
  • Print_ISBN
    0-7803-3854-5
  • Type

    conf

  • DOI
    10.1109/RRCON.1997.581391
  • Filename
    581391