DocumentCode :
3432065
Title :
Green power from conventional steam power plant combined with geothermal well
Author :
Buchta, Janusz
Author_Institution :
Tech. Univ. of Lodz, Lodz
fYear :
2009
fDate :
10-13 Feb. 2009
Firstpage :
1
Lastpage :
6
Abstract :
Hybrid steam power plant with geothermal feedwater preheating enables conversion of low temperature geothermal resources into electricity. The paper presents results of calculation of some performance parameters for 200 MWe fossil power unit associated with geothermal well. The paper gives separation rule of renewable energy from conventional one at hybrid power plant output. An influence of geothermal fluid temperature on hybrid power plant performance is discussed in a study and illustrated in several charts.
Keywords :
geothermal power stations; renewable energy sources; steam power stations; Green power; conventional steam power plant; fossil power unit; geothermal feedwater preheating; geothermal well; hybrid steam power plant; renewable energy; Costs; Energy conversion; Geothermal energy; Geothermal power generation; Hybrid power systems; Investments; Power generation; Renewable energy resources; Temperature; Turbines;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Technology, 2009. ICIT 2009. IEEE International Conference on
Conference_Location :
Gippsland, VIC
Print_ISBN :
978-1-4244-3506-7
Electronic_ISBN :
978-1-4244-3507-4
Type :
conf
DOI :
10.1109/ICIT.2009.4939553
Filename :
4939553
Link To Document :
بازگشت