DocumentCode :
3432651
Title :
A preventive maintenance forecast method for interval triggers
Author :
Chih-Hong, Li ; Shih-Chao, Chang
Author_Institution :
Winbond Electron. Corp., Hsinchu, Taiwan
fYear :
2002
fDate :
10-11 Dec. 2002
Firstpage :
275
Lastpage :
277
Abstract :
There are two methods to schedule PMs: periodic trigger and interval trigger. Periodic trigger is based on working days, and can be predicted rather easily. Interval trigger is based on a certain measurement, such as the accumulated RF hours, accumulated thickness, number of wafers processed, etc. However, predicting the next PM date by interval trigger is not as easy. To solve this issue, we devised a new forecast method for interval triggered PMs. It can cope with exceptional events and plan accurate PM schedules.
Keywords :
forecasting theory; preventive maintenance; scheduling; forecast method; interval trigger; periodic trigger; preventive maintenance; working days; Computer integrated manufacturing; Computerized monitoring; Degradation; Employment; Job shop scheduling; Preventive maintenance; Production; Radio frequency; Thickness measurement; Volume measurement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing Technology Workshop, 2002
Print_ISBN :
0-7803-7604-8
Type :
conf
DOI :
10.1109/SMTW.2002.1197446
Filename :
1197446
Link To Document :
بازگشت